Connected
project data.
The source record links drawings, calculations, specifications, review notes, and revisions. It provides the evidence and context behind each task.
We turn connected engineering project records into tasks AI teams can use to evaluate and train models. Each task includes source artifacts, a defined problem, an expert reference answer and scoring criteria. When needed, we add a repeatable environment for tool-based work.
One revision conflict. One missing section. A checkable answer.
Example only; not a reported model result.
Model task Reconcile the revised plan against the earlier drawing and quantity sheet. Produce a cited change log, identify the stale quantity, and state what cannot be checked.
Expected answer: lining length increases from 180 m in R1 to 210 m in R2 (+30 m). The quantity sheet still shows 180 m and needs reconciliation. Cite both drawings and the quantity sheet; leave excavation volumes unverified without the revised cross-section.
A rejected calculation. A drawing revised after review. A field finding that changed a canal design. A test result that sent a PCB back for revision.
The useful information is how each decision connects to the requirements, documents, and later work—not how many files were archived.
The project is the dataset. Not just the files.
The source record provides the evidence. Benchmarks measure performance. Environments support practice.
The source record links drawings, calculations, specifications, review notes, and revisions. It provides the evidence and context behind each task.
Defined tasks with expert reference answers and scoring criteria. They measure whether a model completes the work and supports its conclusions with evidence.
Repeatable, tool-based engineering tasks with feedback and verifiable checks. For example: an agent opens a CAD model, revises a design element, runs checks, reviews failures, and corrects its output.
Start with the project evidence. Define a bounded engineering problem. Establish what a reviewable answer must contain.
Agree on permissions and select the source artifacts.
Link the revisions, calculations, and dependencies.
Define the problem, evidence, and deliverable.
Have engineers establish the expected answer and rubric.
Provide the task and, where needed, a repeatable environment.
These tasks identify discrepancies for engineering review. They do not replace professional design approval.
Reconcile a structural drawing with its supporting calculations. Cite discrepancies and flag what needs engineer review.
Compare canal plan revisions. Trace their effects on lining and excavation quantities, citing sources and flagging missing sections.
Reconcile a circuit schematic, PCB layout, and manufacturing netlist. Flag a stale revision and cite the affected connections.
A useful engineering answer shows its sources, explains its calculations, and identifies what cannot be verified. Engineers remain responsible for review and approval.
Review an illustrative task format with source artifacts, an expert reference answer, and scoring criteria.
REQUEST A BENCHMARK SAMPLEDiscuss use of historical project records under agreed permissions, confidentiality terms, and licensing scope.
DISCUSS A DATA PARTNERSHIPTell us whether you're evaluating engineering AI or exploring a project-data partnership. We'll use your details to follow up on this inquiry.